Sarah and her girls are using their new bathroom (which is a big relief after 2 1/2 weeks), and it looks so fresh and lovely! There are a couple of items that still needed to be installed. Once these are finished I will post up a final with a recap of all of the products. In the meantime if you want to see the list of products click here for all of the related posts.
Items to be Finished:
-The sconces are on back order and won’t be here until June.
-The pictures for the wall are also not framed yet but they look great and I can’t wait to see them installed.
-A couple of extra knobs are needed for the vanity
I also forgot to take a picture of the new ceiling light fixture (which is a beautiful shiny fixture from Restoration Hardware) and the side of the vanity. The contractor moved the electrical outlet to the short wall next to the tub down low. Then we added a couple of hooks to the side of the vanity to hide the hairdryer and brush (finding a place for the hairdryer and brush was on Sarah’s wish list).
So without further ado here it is…
As a Reminder here are the before pictures and the mood board: