Hi All! I hope everyone is staying warm and safe! We are going a little stir crazy here. 2 snow days and 1 delayed opening this week alone. Fortunately, we have only lost a few branches and have kept power. Fingers crossed that the storm headed this way on Sunday will be small! tower-progress020614-3In all of this mess, we did manage to do a lot of painting over the weekend (while Grandma and Grandpa came to visit) and our contractor was here on Tuesday putting in the rest of the doors. Mr. S. was very excited to start filling the shelves (behind the doors on the left). They are pretty much full now with plastic bins of baby clothes, boxes of cds, suitcases and all sorts of random stuff that came in from the garage. After months of putting stuff out in the garage it is a relief to bring things back into the house! And the good news is that once Mr. S’s office is complete, a good portion of this stuff will leave this closet. The doors on the right hide our clothing rod. This will store our out of season coats and clothes. I’ve also started moving smaller random house stuff like vases and lamp shades into the cabinet at the back. I hope to move all of my random decorations that I am not using into that cabinet. tower-progress020614-2The fort portion of the tower is almost complete. The ceiling, walls, wainscot and trim is all painted. 1 side of the rope guardrail is in and 1 of the 4 windows is reglazed and installed. We still need a ladder and to cut the carpet tile to fit the floor and finish the window trim and stain it all too match.  Meanwhile the light fixture is in and I am in love! It is made of rice shaped seashell pieces and resin. It has a really nice warm glow (with a warm LED Cree light bulb installed). tower-progress020614 We are still debating whether to put beanbags or just pillow up in the space. We will have to try it out this weekend and see what we think. Mr. S. now jokes that this will be the most complete room in the house! Considering it is only 7′-2″x7′-2″ it should be. Stay warm and safe! I’m going to go put a sweater on and try to keep warm!

1 Comment

piano-valentinesday1 Things have slowed down up on the third floor (I guess that is what happens when it there isn’t a contractor here to keep things going and you have to go to work). So I will distract you with pretty pink things instead! I have been trying to keep the top of the piano looking seasonal since it is the first thing I see when I come in. I bought a couple of new plates from Anthropologie this week. I was looking for knobs for the tower (always nice to come up with an excuse for going) and I was nearby. Of course I visited the clearance section and I found that a couple of the plates that I had admired in the fall were on clearance. I also found some knobs on clearance, so I justified buying the pretty plates. The colors are really great with our Dining Room so I am quite pleased. I am considering hanging a mix of plates in the kitchen and I think a couple of peacocks would fit right in! piano-valentinesday2 I reused Christmas ornaments like I did last year in my bowl. Then I added the gold animals I bought at Target a while back and a pink jug that I bought on super clearance last year. tower-progress013114-1 Of course I can’t leave without giving you a little sneak peak of the tower.  We have been painting a little each night, but it is kind of slow for such a small space since it is hard to fit more than one person up in the loft without touching any wet paint. In fact I have paint in my hair right now! The good news is that we just have the lower wainscot and a last coat on the posts to do up there. Our contractor was here yesterday and installed 3 of the 6 beadboard doors! Our plan is to paint those up this weekend! That also means that I can bring in some of the many bins filling up the garage! tower-progress013114-2Did I mention how hard this space is to photograph? In person it is pretty cool though. It looks like a ship’s cabin. If all goes well this will actually get wrapped up in the next 2 weeks (fingers crossed). antrhopologieflowerhook I will leave you with the cutest flower hooks at Anthropologie. I bought the small one not realizing that they were on sale. Now I wish I had bought more at $2.95 for the small one and $7.95 for the large. I hope everyone has a great weekend!

1 Comment

tower-progress012714-1 Work is still moving along over here! Our contractors finished the ceiling in the tower and the fort is almost ready. We managed to prime everything and paint the ceiling over the weekend and we have nightly homework this week to finish painting the walls and trim. He is schedule to come back over later in the week to install the light fixture and the rope guardrail (in case you were wondering what the holes in the posts were for). We are going to leave the windows stained (at least for now). They need a A LOT of work, so once they are fixed up they may not be in a condition suitable for leaving unpainted, but we thought it is worth a shot. They have never had stops, a sill or casing, so we will be installing those in a little bit (in a matching dark stain). The interior storms will also have a dark brown frame. I am loving the ceiling. We used the thin beadboard that comes in packs from Home Depot. We were covering up a BIG hole, so we installed blocking for the light fixture and for something for the middle of the beadboard to attach to. Then we installed 1×4 diagonally with a circular piece in the middle. The circular piece was a happy accident, since we didn’t take into account the size of the cover plate for the light fixture we had to add that at the last minute. I am really liking the nautical feel. tower-progress012714-3It is such a hard room to take a photo in (13′ tall by 7′-2″ by 7′-3″).  This is view from the adjoining bedroom. The cabinet at the back is our old Ikea shelving unit from our bedroom. Our contractor cut it down by 6″ so it would fit. One of my favorite things is when you walk through this narrow passage way there is such a bright light coming in but you can’t see where it is from at first. tower-progress012714-4 The doors for the closets on either side will be beadboard (sense a theme?). They will hide the shelves on the one side and the clothing rod on the other side. We are also working on finalizing the design for the ladder. I think it is going to be pretty awesome. So the one random old thing in this space is the clothing rod, which is actually an original gas pipe. It was in this space when we moved in and I am pretty sure it has been a clothing rod since the house was built (I wonder what year clothing rods were invented). It has a really thin diameter, but it is super sturdy. I was glad that we could reuse it. I also have a piece of wood with old hooks that will be going back behind the rod as well. tower-progress012714-2 I am pretty sure that my contractor thinks I have lost my mind, making the third floor closet one of the prettiest rooms in the house.I think it is going to be pretty cool when it is finished, and if the kids don’t like it I think Mr. S. is going to move in.

2 Comments

We are Snow Day #2 here (14″ of snow), and everyone is going a little crazy. I’m looking forward to some school tomorrow. I have a lot to jam into the end of the week! Without further ado here are some progress photos of the third floor. tower-progress012014-1Do you think someone is excited for his tower fort? It is still a work in progress, but the kids have had a chance to check it out now. Plus the ceiling is beadboarded and most of the wall repair is complete. There is still a long list of stuff to complete, but I’m not sure how long these two will wait. Of course Mr. S. and I have also checked it out and think it would make a pretty nice hangout spot for us too. craftroom-progress012014-2 Of course I shouldn’t be claiming anyone’s space since the Craft Room/Studio is officially open for business. As always there is still quite a bit to be done, wallpaper to hang, shelves to build and LOTS of organizing. But, I have spent a lot of time up there in the last few days, and even in the cold weather it is feeling quite toasty. We managed to finish the painting on Saturday, which meant that we could bring in the furniture on Sunday. craftroom-progress012014-6 It is difficult to get a good photo of any of the spaces up on the third floor. But the space feel cozy but not too small. The new trestle table is great.  It is the Jackson Table from World Market. It is just the right size and looks like it should hold up well. I may put some extra clear coat on the top since the finish looks like it might not be the most durable. craftroom-progress012014-8 As soon as the furniture was in the kids asked where their art supplies were so they could get started. I got out new notebooks for both kids (Thanks Ikea!). craftroom-progress012014-9My own art and craft supplies will be stored in these 2 beauties! I bought these Martha Stewart Craft Carts on clearance a couple of months ago in Sharky Gray, but they are still available for $129 each with free shipping in several other colors. They came in 2 HEAVY boxes each and I’m not sure whether they would actually make it down the stairs in 1 piece, now that they are assembled (I guess I can never move). I’ve had my supplies scattered around in multiple locations for years, so this is a pretty exciting development for me! I even started going through some of my sewing supplies which includes several boxes from my grandmother’s stash. Sewing will probably be the first major projects in here, as I have curtains to make for the Master Bedroom and cushions for in here. craftroom-progress012014-3 I bought some fabric at the Galbraith and Paul annual showroom sale in December. They make such beautiful block patterns! Normally their prices are quite steep, but they sell smaller remnants by the pound. Needless to say it was crazy fighting it out with a bunch of other designers, but I came home with these beauties that I am planning on using for pillows for the space. craftroom-progress012014-1 Finally, I thought I would show you the knobs for the storage spaces in the eaves. I bought these on clearance at Anthropologie a couple of years ago. They only had 3 which I quickly snapped up for $3.99, not knowing what I would use them for. I think it is my happiest accident in the space! I have more to show, but of course the space has already been filled up with boxes from around the house, just waiting to be sorted. Next up I thought I would share a couple of fun finds from my grandma’s sewing stash. I hope everyone is staying warm! It is quite cold here with no end in sight.

6 Comments

tower-progress010914-1

Thought I would show you a quick update of the tower (from about 15 minutes ago). My contractor had a free day in his schedule this week, so I had him get started on the framing for the tower room/closet/fort. There is a lot to do, but it is pretty darn exciting to see the framing go up! It will be slower going after today, but I am an excited girl (and I know a couple of little ones who will be impatiently waiting for their fort to be finished).

Leave a comment
tree-canningjar

My favorite 2 minute craft from the 2013 holidays! 1 Miniature Tree in a Blue Canning Jar.

Happy New Year Everyone! I can’t believe it is already the second week of the year! We had a nice quiet New Years followed by 1 day of school and then a snow day! Now the snow has melted but we are having the coldest weather in 20 years. The downstairs is a bit chilly (as I sit here in multiple layers). Fortunately all the insulation in the roof means that the second floor is nice and toasty, even if there is a 20 degree differential right now between the 2 floors!

I’m not normally very good with New Year’s Resolutions but I have decided that there is one this year that I am going to try to work on. Spend more time with my family! Technically I do spend a fair amount of time with them, but the resolution is about spending quality time, where I am not distracted by the million of other things going on. I’m not quite sure how I am going to pull it off, but I am going to try. What New Year’s Resolutions have you made?

craftroom-011In other news, we did manage to actually have a fairly productive weekend. Mr. S. and I decided it was time to get working on the Craft Room. We have spent countless hours trying to get the walls and ceiling smooth. Between wallpaper that wouldn’t cooperate, old plaster with cracks and no finish coat, and patching from the holes for the insulation, I thought it was never going to end. Every time I would tell myself that it was the last coat of spackle I would find more spots. Well, we finally called the walls done and primed and painted. So far we have 2 coats of paint and I might go for 3 on the sloped ceiling/wall, since it shows every imperfection thanks to its super close proximity to your eyes and the way the window sits. We still have to prime and paint the trim and bench. craftroom-012 The door to the room will be staying stained, as it is one of the few places in the house to have its original finish. Almost everywhere else that is a stained finish the previous owner striped back, so it doesn’t have the same luster as this. The rest of the trim will be painted white to keep it clean. The walls themselves are a light gray, just enough color so the whit trim will pop against them. Fortunately the dark brown painted floor is in really good shape! There was nasty carpet covering it, that we chose to leave in place until the wall and ceiling painting was complete. It was very exciting to bring it out to the garbage yesterday! Hopefully by next week we can start actually bringing in the rest of the furniture and accessories! I am also ordering a couple of storm windows for the room. Once they arrive (and I hopefully like them) I will give you some more details!

I hope everyone is having a great 2014! Cheers!

Leave a comment

craftroom1-wallpapermoodboard

The Craftroom/Studio is moving along slowly. It is hard to get motivated to sand and reapply spackle yet again! So in my procrastination I have started to think about wallpaper for the back wall. Yes, after spending lots of time getting the walls nice and smooth I am going to cover one of them up! But I do like the idea of a pop, that will help accentuate the shape of the room. Am I completely crazy? Maybe I have breathed in too much dust.

Here are a few of my current contenders (samples are on their way):

craftroom-wallpaper4

This is Indira Damson (W0019/03) by Clarke & Clarke Wallpapers. I actually remember seeing this wallpaper on pinterest a few months ago and thought it was really pretty. It is certainly dramatic!

craftroom-wallpaper3The second choice is a beautiful Bumble Bee (BP 555) Wallpaper by Farrow & Ball Wallpapers. The gold metallic is quite stunning but I’m not sure if the blue might be a little overpowering.

craftroom-wallpaper2The third choice is my current favorite. The Globetrotter Natural (W0015/02) by Clarke & Clarke Wallpapers has famous building drawn on it. The description says that the pattern is “gold”. I will have to wait to see the sample in person to see if it actually metallic or not. I think it could be nice without being overpowering. The only question is whether it is too boring and not graphic enough. I could also get it with the pattern in pink. hmmm….

craftroom-wallpaper1Finally here is a crazy water scene that I thought might be fun. Nympheus (BW45033/1)  by G P & J Baker Wallpapers.

For more of the wallpapers I have been considering you can check out my Pinterest page.

So have I completely lost my mind?

5 Comments

craftroom-progress1

There has finally been some progress over here on our third floor! Our contractors worked part of last week to get our Craftroom closed up (i.e. no open walls where cats and small children could get stuck). I had them build in some storage in the eaves while they were at it and for good measure add a bench on the window wall. We are still spackling and cleaning up the old plaster walls. Then comes priming and painting. I think we are still a couple of weeks away from actually being able to use the room, but that is a LOT closer than where we have been for the last several months.

thirdfloor-craftroom-716x1024

The picture above is where we started. Basically a storage room with 1980s wallpaper and no insulation, heat or storage. I still need to order the storm windows (and eventually restore these windows) but it is at least now comfortable to spend time in (if you don’t mind spackle dust). Now that we are in the home stretch, I’ve been refining my Victorian Industrial Glam aesthetic. I think I am headed slightly more industrial than glam these days, but I think it is going to be a really great space. Finally a spot where we can work on projects and not have to clear them off the table to eat dinner.

craftroom1

I think I have a good mix of storage and am looking forward to having a spot for a lot of homeless items that sits in corners all over the house. I will put together a separate post on all of the furniture and accessories I have been hoarding carefully choosing.

2 Comments

wall-signature

I hope everyone had a lovely weekend! The weather was beautiful here and a Saturday night rain, made weeding on Sunday a joy! I spent most of the weekend outside between soccer, planting and the Scott Arboretum Plant Sale. I will have to share my new little plant friends in a separate post, but I thought I would show you some progress on the Third Floor today. While I was playing in the dirt, Mr. S. took on removing the wallpaper in the 3rd Floor Stairway. There is still a little bit more work with some extra fuzzy patches, but we got a much better look at the conditions of the walls. We also found a signature from the original paper hanger (the previous owner had mentioned that it was somewhere up on the third floor). We think its says: “M E Albertson Paper Hanger December 31st 1892 Residence Clifton Heights Del Co (Delaware County) Pa“. Pretty cool! Mr. S. worked on the photo to make it more legible, it is harder to make out in person. Too bad it is in a terrible spot right where the hand rail normally goes and adjacent to a bad spot of plaster. We haven’t decided what to do about it. We are planning on painting the whole stairway, but I feel like we can’t paint over it. I was thinking that we might cover it with some wallpaper that we could paint over (so it could be protected and later removed) but look clean for now. Why oh why couldn’t he have signed it up higher in a good spot?

stairway6

The signature is in the lower left corner.

As you can see it is REALLY difficult to take pictures of the space since it so narrow and tall, with alcoves at the top.

stairway2

Here is the inside of the new window. Our contractor trimmed it out with a simple trim piece with a bead on 1 side. This matches the trim piece below the sills on this floor. I still have to paint the trim though. The extra board is there to act as a guard for the kids. I like the new window but the screen is definitely sub-par. I haven’t decided whether this will stay or we will replace it with something different (copper pipes perhaps?) but in the meantime we will paint it out white so that everyone remains safe. The new window was in full use this weekend with the fan going. It was pretty amazing to see how much hot air came up the stairs.

stairway3One of the first projects for up here once we finish the plaster work and paint is to build 2 little seats on either side of the alcove. The kids already love to hide up here, and I think it would be a great little spot with a soft pillow.

stairway4 As you can see I needed 2 photos put together to get a view looking back down the stairs. I wanted to show you the weird ledge above the staircase and our new fan (which matches the one on the second floor). Mr. S. thinks it needs a large bust.  I’m not sure what will end up there, but it definitely needs to be interesting. Any suggestions?

4 Comments

New Third Floor Window

September 18, 2013 — 2 Comments

dormerwindow3

The day has finally arrived for my new third floor window to be installed! It is a custom order Jeld-Wen window with custom size and patterned mullions (which took 6 weeks to arrive after I signed off on the drawings). We also went with an aluminum clad exterior in a color in light green to match one of the accent colors on the house.  I’m pretty excited! My contractor is working on the final trim and fitout right now.  I know that a lot of the old home enthusists are shaking their heads, but I have plenty of windows that will be restored/rebuilt (i.e. the rest of the third floor) with new interior storms but this one, which is pretty much the only one we will be opening on a regular basis, I decided to go with functionality (and energy efficiency). Speaking of which, does anyone have an interior storm manufacturer that they recommend? I’ve been looking around, but haven’t come to a consensus. I need to have these in place before I can have the rest of the third floor windows removed to have them rebuilt.

house-backdormer-beforeThis is where we started with a leaky set of window that needed to have its sill completely replaced (along with the original 1888 cedar shingles). This involved disassembling the entire area including the structure in between the 3 windows. We were left with a hard decision to replace or rebuild. In the end we decided that if we were going to spend money at this location, we really wanted some function. The window is at the top of the third floor stairs and is great at exhausting out hot air on a warm day. I spent a lot of time deciding on the configuration of the mullions. Here is my rendering:

house-backdormer-rendering

And here is how it has been sitting for the last couple of months:

dormerwindow1 And here it is right now (i.e. about 10 minutes ago as I waited for my contractor to put it in):

dormerwindow4

I still need to paint the new aluminum sill to match the dark green trim, but I am pretty excited. I will be back with some interior shots tomorrow. I hope everyone is having a good week!